First thig to do is clean everything with a mild
detergent, and rinse off thoroughly. Ensure everything is thoroughly
dry before you try to glue or weld it, it works much better that
way! During construction try everything as a dry run
first, you do not get a second attempt with solvent weld. Work in
a well ventilated area (it stinks), and apply liberally all the
way around the pipe / join to be made. When making the joint, quickly
twist the items to spread the solvent weld, and ensure a watertight
joint.
Top Section construction
 
Solvent Weld the access cap to the top main fitting, then a 65mm
length of 40mm pipe in to the side outlet if plumbing the unit as
bypass. Note the orientation of the Top main fitting, as the access
cap will fit both ends.
|